Yadavaran oil field, is located about 15*45 km, lies 70 km southwest of Ahvaz and 130 km southeast of the Azadegan oil field, stradding the Iran-Iraq border. The field Initial development phase were carried out targeting the drilling of 57 wells into the Fahliyan and Sarvak reservoirs, with a production capacity reaching of 115000bbl/day. In the second phase of the Yadavarn oil field, drilling 260 additional development wells, execution of well intervention operations, including workover and recompletion of phase one existing wells, execution of pilot studies on EOR techniques within the reservoir, construction of CTEP, and installation of wellhead facilities, flowlines, and transmission pipelines have been planned and are underay.